In order to enhance users' experience on DOB NOW: Build, the following additional system updates have been made:
Site
Survey: Initial and Plot Diagram: Added as Required Documents for New
Building, Alteration-COs and Alterations with enlargement, General
Construction (GC) filings.
Zoning and Special Districts: Paired
districts and three new special districts were added as selections for
Zoning Information.
Requests
to waive or defer a required document: Any stakeholder can now select
the option to request a waiver or deferral, not just the applicant. The
request is not submitted until the filing/permit is submitted by the
applicant. Also, waiver/deferral requests can be made at any time, not
just at the stage indicated on the required document. e.g.
a waiver for a document that is required prior to permit can now be
requested when the job is in pre-filing status.
Standpipe
Alarm Drawings document: Standpipe Alarm Drawings are no longer
populating as a required document for 1, 2 or 3-family properties. It is
a required document for NB and AltCO jobs where
the existing building height is <75 ft and the proposed building
height is >75 feet.
Work
Permit data fields added in the Public Portal: Applicant/Contractor
and Permit Expiration Date were added as fields when viewing permits in
the Public Portal.
|