Dear DOB Community:
We
are now days away
from a major expansion of DOB
NOW: Build, and other
exciting updates we are making
to ensure that DOB NOW continues
to better serve our customers.
 |
July
Releases |
Mechanical*, Structural*,
Plumbing, Sprinkler,
and Standpipe new filings
must be submitted in DOB NOW:
Build starting July 1st,
2019.
New Buildings and General
Construction work will
continue to be filed in BIS.
There is a field in DOB NOW to
enter the associated BIS job
number.
*Exception: for one and
two family homes, separate
Mechanical and Structural
filings are not required and
the mechanical and
structural elements may
instead be included on the
architectural plan set for
the OT-GC filing (do not
list MS or ST in Box 6D). If
the applicant of record on
these filings is not the
same, separate filings will
need to be submitted in DOB
NOW for the Mechanical or
Structural work.
More information is available in the
Service Notice.
 |
Interface Improvements and Training Sessions |
Improved DOB NOW: Build
Interface
Filers of existing DOB NOW work
types (Antenna, Curb Cut, Fence,
Scaffold, Shed, and Sign) will
see an improved layout as part
of our effort to make the PW1
section the same for all work
types. The user interface that
launched with Place of Assembly/
Temporary Place of Assembly
filings in December will be seen
throughout DOB NOW: Build.
In-person and Online DOB NOW:
Build Training Sessions
Training sessions
have been held all this month
and will continue throughout
July, both in person and
online. Over 2,000 industry
members have registered to date
and if you are an architect,
concrete director, general
contractor, filing
representative, plumber,
professional engineer, special
inspector, or other professional
involved in the above work types
then we encourage you to do so
as well. Additionally,
check out the resources
on the DOB NOW: Build
webpage which includes links to
step-by-step guides,
presentations and easy-to-follow
videos.
 |
New
Review Request Process for Civil Penalties |
Requests
for overrides, reductions, or
waivers of civil penalties for
Work Without a Permit Violations
(L2) for DOB NOW filings
created on or after July 1st,
2019 will be submitted
through DOB NOW. Read the
Service Notice for more details.
 |
New
Process for Gas Inspections in the Bronx
and Queens |
Beginning July 12, Gas Test and Gas Finish
self-certifications will no
longer be allowed in the Bronx
and Queens and inspections will
need to be requested in DOB NOW:
Inspections. Read the
Service Notice for more details.
 |
Final Inspection Required by
Registered Design
Professional |
Applications submitted through
DOB NOW for work types listed in
Buildings Bulletin 2018-008 including Antenna, Fence, Shed
and Scaffold will include Final Inspection as a required
progress inspection. Read the Service Notice for more details.
 |
Coming Soon |
In
September, Boiler Equipment
(boilers, fuel burners, and fuel
storage) filings will be
launching in DOB NOW so be on
the lookout for a Service Notice
with all the details. And next
year, we will add General
Construction and a suite of
additional functionality to DOB
NOW.
Thank you for your interest as
we continue to improve our
systems that are a vital part
our efforts to bring you a
better Buildings Department. If
you have any questions or
comments, please use the
DOB NOW Help Form.
Best,

Archana Jayaram
Deputy Commissioner of Strategic
Planning and Policy
You can
unsubscribe
from all Department of Buildings emails by editing your account
settings. By unsubscribing, you will opt out of Buildings News
as well as the DOB NOW Digest. |