Initial Project Checklist

DO

  • Pre-Project: Make sure you hire a Registered Design Professional, a Professional Engineer (P.E.), or a Registered Architect (R.A.), to ensure your project is Code-compliant.
  • Project Plans: Only a Registered Design Professional can submit construction documents, including drawings and other submissions, to DOB for approval.
  • Site Survey Work: Hire a NYS Licensed Land Surveyor to prepare a site survey showing all existing conditions.
  • Asbestos Investigation: Have asbestos investigation performed on site to check for Asbestos Containing Material (ACM) that will be removed or disturbed.
  • Project Work: Hire a licensed Contractor to perform the work. When hiring a licensed contractor, have a written contract that includes the Contractor’s company name, address and license number(s).
  • Post Permit: Ensure permit is posted in a conspicuous place at the work site for the duration of the work.
  • Work Completion: Ensure the Contractor has completed all Department inspections and obtained a sign-off to close out the completed work filed under the project permit, and if required, commissioning must be filed with DOB prior to sign-off.
  • Provide Contact Information: Per DOB NOW, Owners must provide their email address to the Department for correspondence, during submission, permit, inspections and final sign-off of the project.

DON’T

  • Work Without a Permit: Do not begin work without a DOB permit. Even if the application for work has been approved, property owners and the people performing work without a permit may face violations with penalties, court appearances, and civil or criminal penalties.

Get a printable version.

Prior to Application Approval Checklist

  • Hire a Registered Design Professional (RDP), P.E. or R.A., to consult and finalize scope of work.
  • Provide consent of the project permit application, and authorize the P.E. or R.A. – who is the ‘Applicant of Record’ – to submit project Construction Documents for Department approval.
  • Hire a licensed surveyor to provide a survey of existing conditions.
  • Project approval is required prior to beginning work.
  • *Note: The Owner of the building/property is ultimately responsible for the project, and their signature/consent is required for submission of the project application by their design professional, and Department approval.*

Get a printable version.

Pre-Permit & On-going Project Work Checklist

Pre-Permit

  • Licensed Contractor: Hire NYC Licensed/Registered Contractor to obtain work permit(s) in order to begin work.
  • Special Inspections: If the scope of work requires special inspections, hire the required Special Inspection Agency for performing Special/Progress Inspections.
  • Notify the Department: Prior to permit, provide the names of special inspection agencies hired to do the Special Inspections, using an online submission.

On-going

  • Site Safety: Property Owners must maintain their properties in a safe condition during the course of work.

Get a printable version.

Project Completion Close-out Checklist

  • Special Inspections: If the scope of work requires, the Special Inspection Agency hired must complete these and submit results online to the Department.
  • Department Inspections: Make sure the Contractor has completed all Department of Buildings inspections and has obtained sign-off of the completed work.
  • Permit Sign-off: Confirm that the Contractor has requested and passed a final sign-off inspection required by the Department.
  • Final Survey: Hire a licensed Surveyor to submit a final survey.

Get a printable version.