Reports

Reports

Complete the Legalization Progress Report if the Loft Board has issued a Certification of Owner’s Legalization Plan and the Owner has not obtained a residential Certification of Occupancy for the spaces covered under Article 7-C of the Multiple Dwelling Law (MDL). If required to file, complete parts 1 to 6 and attach documentation of any new legalization stage reached. Include a description of the legalization work in the legalization plan and narrative statement certified by the Loft Board, completed within the last thirty (30) days. Attach additional sheets if necessary.

Helpful Links