Complete the Legalization Progress Report if the Loft Board has issued a Certification of Owner’s Legalization Plan and the Owner has not obtained a residential Certification of Occupancy for the spaces covered under Article 7-C of the Multiple Dwelling Law (MDL). If required to file, complete parts 1 to 6 and attach documentation of any new legalization stage reached. Include a description of the legalization work in the legalization plan and narrative statement certified by the Loft Board, completed within the last thirty (30) days. Attach additional sheets if necessary.